軟件設計師當天每日一練試題地址:www.richmond-chase.com/exam/ExamDay.aspx?t1=4
往期軟件設計師每日一練試題匯總:www.richmond-chase.com/class/27/e4_1.html
軟件設計師每日一練試題(2025/4/25)在線測試:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
點擊查看:更多軟件設計師習題與指導
軟件設計師每日一練試題內容(2025/4/25)
試題1
設有如下所示的下三角矩陣A[0..8,0..8],將該三角矩陣的非零元素(即行下標不小于列下標的所有元素 )按行優(yōu)先壓縮存儲在數(shù)組(0 ≤i ≤8, j ≤i )存儲在數(shù)組M的( ) 中。
A. A
B. B
C. C
D. D
查看答案
試題參考答案:A
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題2
在如下所示的數(shù)據流圖中,共存在()個錯誤。
A.4
B.6
C.8
D.9
查看答案
試題參考答案:B
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題3
在面向對象系統(tǒng)中,用 ( ) 關系表示一個較大的“整體”類包含一個或多個較小的“部分”類。
A、泛化
B、聚合
C、概化
D、合成
查看答案
試題參考答案:B
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題4
以下關于網絡中存在各種交換設備的敘述中,錯誤的是()。
A.以太網交換機根據MAC地址進行交換
B.幀中繼交換機只能根據虛電路號DLCI進行交換
C.三層交換機只能根據第三層協(xié)議進行交換
D.ATM交換機根據虛電路標識進行信元交換
查看答案
試題參考答案:C
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題5
高級語言源程序的編譯過程分若干個階段,分配寄存器屬于 ( ) 階段的工作。
A、詞法分析
B、語法分析
C、語義分析
D、代碼生成
查看答案
試題參考答案:D
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題6
下列網絡攻擊行為中,屬于 DOS 攻擊 ()
A.特洛伊木馬攻擊
B.SYNFlooding 攻擊
C.端口欺騙攻擊
D.IP欺騙攻擊
查看答案
試題參考答案:B
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題7
設 L 為廣義表,將 head(L)定義為取非空廣義表的第一個元素,tail(L)定義為取非空廣義表除第一個元素外剩余元素構成的廣義表。若廣義表 L=((x,y,z),a,(u,t,w)),則從 L 中取出原子項 y 的運算是 ( ) 。
A、head(tail(tail(L)))
B、tail(head(head(L)))
C、head(tail(head(L)))
D、tail(tail(head(L)))
查看答案
試題參考答案:C
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題8
若棧采用順序存儲方式,現(xiàn)有兩棧共享空間V[1..n],, top[i]代表i(i=1,2)個棧的棧頂(兩個棧都空時top[1]= 1、top[2]= n),棧1的底在V[1],棧2的底在V[n],則棧滿(即n個元素暫存在這兩個棧)的條件是( )查看答案
試題參考答案:D
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題9
Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2). He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4).
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be (5) to the new problem.
A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
(1) A. customers
B. managers
C. users
D. administrators
(2)A. activity
B. procedure
C. process
D. progress
(3) A. parts
B. modules
C. software
D. a whole
(4) A. parts
B. modules
C. software
D. a whole
(5) A. modified
B. used
C. suited
D. tailored
查看答案
試題參考答案:B、C、A、D、D
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
試題10
給定關系模式R{A1,A2,A3,A4)上的函數(shù)依賴集F={A1A3 →A2,A2→A3}。若將R分解為P={(A1,A2),(A1,A3)},則該分解是( )的。
A.無損聯(lián)接且不保持函數(shù)依賴
B.無損聯(lián)接且保持函數(shù)依賴
C.有損聯(lián)接且保持函數(shù)依賴
D.有損聯(lián)接且不保持函數(shù)依賴
查看答案
試題參考答案:D
試題解析與討論:www.richmond-chase.com/exam/ExamDay.aspx?t1=4&day=2025/4/25
信管網訂閱號
信管網視頻號
信管網抖音號
溫馨提示:因考試政策、內容不斷變化與調整,信管網網站提供的以上信息僅供參考,如有異議,請以權威部門公布的內容為準!
信管網致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。
信管網軟考課程由信管網依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |