系統(tǒng)集成項(xiàng)目管理工程師每日一練試題內(nèi)容(2024/3/21)
試題1
Perform Quality Control is the process of monitoring and recording results of executing the Quality Plan activities to assess performance and recommend necessary changes.( ) are the techniques and tools in performing quality control.
①Statistical sampling ②Run chart ③Control charts
④Critical Path Method ⑤Pareto chart ⑥Cause and effect diagrams
A.①②③④
B.②③④⑤
C.①②③⑤⑥
D.①③④⑤⑥
查看答案
試題參考答案:C
試題2
The work that needs to be accomplished to deliver a product, service ,or result with the specified features and functions is called ( ).
A、Scope management
B、Integrated management
C、SOW
D、PMO
查看答案
試題參考答案:A
試題3
根據(jù)《信息技術(shù) 軟件工程術(shù)語(yǔ) GB/T11457-2006》。( )是評(píng)價(jià)系統(tǒng)或軟件,以確定軟件開(kāi)發(fā)周期中的一個(gè)給定階段的產(chǎn)品是否滿(mǎn)足在階段的開(kāi)始確立的需求的過(guò)程。
A、認(rèn)證
B、確認(rèn)
C、審計(jì)
D、驗(yàn)證
查看答案
試題參考答案:D
試題4
()is not included in the main contents of the operation and maintenance of the information system.
A.Daily operation and maintenance
B.System change
C.Security management
D.Business change
查看答案
試題參考答案:D
試題5
根據(jù)GB/T 12504-1990《計(jì)算機(jī)軟件質(zhì)量保證計(jì)劃規(guī)范》規(guī)定,基本文檔最小集可不包括(1)。(2)是在軟件發(fā)布前,要對(duì)軟件進(jìn)行檢查,以確認(rèn)已滿(mǎn)足在軟件規(guī)格說(shuō)明書(shū)中的規(guī)定的所有需求。查看答案
試題參考答案:C、C
試題6
The project manager can arrange the project schedule management activities in the following order()。查看答案
試題參考答案:D
試題7
() management includes negotiating the terms and conditions in contracts and ensuring compliance with. the terms and conditions, as well as documenting and agreeing on any changes or amendments that may arise during its implementation or execution.
A.Contract
B.Document
C.Communication
D.Risk
查看答案
試題參考答案:A
試題8
A schedule is commonly used in project planning and project portfolio management. () on a schedule may be closely related to the work breakdown structure (WBS)terminal elements, the statement of work, or a contract data requirements list.
A.Essences
B.Elements
C.Purposes
D.Issues
查看答案
試題參考答案:B
試題9
The ( ) refers to the integration of complex physical machinery with networked sensors and software. It draws together fields such as machine learning, big data, the Internet of things and machine-to-machine communication to ingest data form machines, analyze it (often in real-time), and use it to adjust operations.
A. Industrial internet
B. factory internet
C. Industrial web
D. business internet
查看答案
試題參考答案:A
試題10
合同法律關(guān)系是指由合同法律規(guī)范調(diào)整的在民事流轉(zhuǎn)過(guò)程中形成的( )
A.買(mǎi)賣(mài)關(guān)系
B.監(jiān)督關(guān)系
C.權(quán)利義務(wù)關(guān)系
D.管控關(guān)系
查看答案
試題參考答案:C
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門(mén)公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛(ài)好者、大學(xué)生提供專(zhuān)業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書(shū)、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專(zhuān)業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿(mǎn)足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |