During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised ( )are necessary.
A. proceedings
B. controls
C. forecasting’s
D. prelibations
試題2
UML2.0中共包括14種圖,其中()屬于交互圖。試題3
數據價值化是指以()為起點,經歷數據資產化,數據資本化的階段,實現數據價值化的過程。信息系統(tǒng)項目管理師每日練習題答案解析(2023/8/27)
試題1
信管網參考答案:B
信管網參考解析:
參考譯文
在一個項目的生命期內,有多種原因可以引起對需求的變更。當需要發(fā)生變更而工作正在進行時,可導致新的需求產生并迫使現有的需求發(fā)生變更。需要快速而有效地管理這些新的需求和新的變更。為了有效地分析這些變更的影響,必須確定每一個需求源,并記錄變更的基本過程。無論如何,項目經理希望能追蹤有關需求穩(wěn)定性的、恰當的措施,以判斷是否需要新的或修正的控制措施。
試題2
信管網參考答案:B
信管網參考解析:
軟題庫原題:http://www.ruantiku.com/shiti/32258167.html
交互圖展現了一種交互,它由一組對象或參與者以及它們之間可能發(fā)送的消息構成。交互圖專注于系統(tǒng)的動態(tài)視圖。
交互圖包括:順序圖、通信圖、定時圖
UML 2.0中的圖:http://www.richmond-chase.com/pm1/48586.html
試題3
信管網參考答案:B
信管網參考解析:數據價值化是指以數據資源化為起點,經歷數據資產化、_數據資本化階段,實現數據價值化的經濟過程。
信管網訂閱號
信管網視頻號
信管網抖音號
溫馨提示:因考試政策、內容不斷變化與調整,信管網網站提供的以上信息僅供參考,如有異議,請以權威部門公布的內容為準!
信管網致力于為廣大信管從業(yè)人員、愛好者、大學生提供專業(yè)、高質量的課程和服務,解決其考試證書、技能提升和就業(yè)的需求。
信管網軟考課程由信管網依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過深研歷年考試出題規(guī)律與考試大綱,深挖核心知識與高頻考點,為學員考試保駕護航。面授、直播&錄播,多種班型靈活學習,滿足不同學員考證需求,降低課程學習難度,使學習效果事半功倍。
發(fā)表評論 查看完整評論 | |